Hangar H20 Airtight

Hangar H20 Airtight

CLIENT
R&D project

DELIVERY
June 2020

LEAD TIME
1 month

Equipped with our state-of-the-art AIRTIGHT technology, that allows reducing energy consumption to zero, this very quick deployment shelter is the perfect solution for many applications in aeronautical, emergencies or industrial. Excellent portability and easy containerization, fits in less than 1 sea container (20 feet). Capable to be set-up in 6 hours on any ground type with minimum foundation requirements.

Dimensions

• 20 meters clear width
• 20 meters clear length
• 10 meters clear height
• 400  useful area

Features

Zero energy consumption. Inflation motors work just few minutes per day.
Quick deployment shelter. Set up time 6 hours.
Short Delivery Time: 1 month.
Withstanding harsh environmental conditions
Telematic Control System: Surveillance of all operational parameters from any computer or smartphone.
Fast operation of the front door (pulleys-based system): opening / closing operations in less than 2 minutes each.
Easy logistics: each complete hangar can be packaged in less than 1 standard 20 feet sea container.

Our main clients

(+34) 933 68 77 72

 

BUILDAIR BARCELONA
Pol. Ind. El Pla – Horta, 6, Naves 3,4,5
08750 – Molins de Rei
Barcelona, Spain

BUILDAIR MADRID
Paseo General Martínez Campos, 41
28019 Madrid
Madrid, Spain

OUR COMPANY

INFLATABLE STRUCTURES

APPLICATIONS

FEATURED PROJECTS

FAQS

CONTACT

(+34) 933 68 77 72

….

BUILDAIR MADRID
Paseo General Martínez Campos, 41
28019 Madrid
Madrid, Spain

BUILDAIR BARCELONA
Pol. Ind. El Pla – Horta, 6, Naves 3,4,5
08750 – Molins de Rei
Barcelona, Spain